15th-19th Nov. 2004
|
Oxford
engineer (Charlie Smith) installs and energizes magnet without
any quenches. He topped up
Problems:
Helium Meter does not work
Supercon
(cryoshims) fell out when removing charging stick
Supercon
Values are:
Z1
-16.563 ZX 1.322
Z2
9.394 ZY -3.433
X
1.703 C2 -1.657
Y
-0.181 S2 -3.705
NB
lots of current in Z1 and Z2
|
7th Dec 2004
|
Mayan Tuazon arrives
from Varian. Tops up He
|
10th Dec 2004
|
Varian engineer had to
recycle the cryoshims. Z1 had fallen out! Topped up He once
again.
New supercon values
are:
Z1
-16.509 ZX 1.237
Z2
13.45 ZY -2.866
X
1.806 C2 -2.371
Y
0.493 S2 -3.704
|
13th Dec
2004
|
Problem with FTS. Iced
up. Problem with compressed air? Fixed and working again
(manufacturer helped)
|
14th Dec
2004
|
Overnight drift test showed that, magnet is very unstable. Not
only was drift very large but the nicely shimmed singlet
gradually split after 3 hours!! Check on net indicates Z1 might
be unstable still. Engineer suggests that we might have to
redo supercon shims!!He Meter still not functioning
For F19 cannot tune
to zero ~ 200 is OK!
|
15th Dec
|
Helium port for
transfer of He liq iced up!! Removed by blowing He gas
over very briefly
After consultation
with bosses at Varian and Oxford it was decided to redo super con
– Z0 by adding ½ amps. This is to make the field go down
(at the moment the field is moving up, and losing shims (Z1 we
think).
Still concerned about
the He meter and the He boil off. Should be less than 35 cc/hr.
|
17th Dec
|
After cycling Z0 and
overnight drift test (stored as 4th) we see the field
drifting in the correct direction. However there is still a
splitting. Varian engineer insists it will settle down. Good news
that it is refitting in the correct direction. Engineer leaves
asks me to install CD r/w and Internet!
|
19th Dec
|
Ran an overnight drift
test
|
20th Dec
|
Results of drift test
show the magnet has settled – however, still splitting.
|
21st Dec
|
Drift test results
again show loss of lineshape and splitting overnight
|
21st Dec -
14th Jan
|
Drift tests indicate
shims being lost
|
13th Jan
2005
|
Oxford Engineer (Ben
Hubbard) comes to install new He probe and meter. It now seems to
work. Meter seems to have been faulty!
|
14th Jan
2005
|
Helium Fill (by
me) did not get to 100%. Need to do this at some point to
recalibrate meter. N2 filled
|
2nd Feb
2005
|
Oxford (Ben Hubbard) recycle shims and ramp Z0 due to problems
with Z1 (and Z2) stability).
New Supercon values:
Z1 -17.22 ZX 1.237
Z2 13.45 ZY -2.866
X 1.87 C2 -2.371
Y 0.6 S2 -3.704
Note also had to reset lock freq. and change RT values.
After cycling, tried to get RT shims to spec – unfortunately I
could not manage it. Might need Varian to remap RT shims
|
4th-7th
Feb
|
Managed to shim D2O down to 4.5 Hz, chloroform to 0.8Hz – still
can't get much lower.
Weekend drift test
showed splitting, similar to that seen before latest cryoshim
cycling.
|
11-14 Feb
|
Shimmed chloroform to 0.7Hz – still can't get much lower.
Weekend drift test
showed splitting, similar to that seen before latest cryoshim
cycling.
|
18-21st Feb
|
Now up on the net.
Varian engineer shimmed chloroform down to 0.5 Hz . Drift test
showed splitting..
|
24th Feb
|
Varian send bursting
disks for replacement. Ask me to replace (I refuse). Varian
believe a He leak is responsible for the faulty reading on the
manostat (probably through the bursting disks). I place rubber
gloves over the disk outlets – no evidence of a He leak. I
personally think the manostat might be faulty, but Varian insist
it is the disks!
|
2nd March
|
Claude Major (Varian)
comes to check for He leaks (since manostat reading never reaches
the setting). Turns out manostat is not working properly (so no
need to change the bursting disks). Manostat was repaired:
setting 1020; reading 1021
|
7th - 8th
March
|
Varian run drift test:
splitting seen. Varian (Ed Fadriallan says he will send a weather
station to check environment
|
15th March
|
Installed Biopack but gives no
signal from HNCO, and other NH-based triple resonance. HSQC's OK.
If use TROSY option, lots of signal. Maybe arcing of probe when
do simultaneous 15N and 13C pulses (not the case – see later)!!
Note: probably due to 15N –
compression was way off expected value of 1.0 (~ 0.7). Not a
reliable diagnostic, admittedly.
Varian
will send over a temporary “replacement” probe!!
|
16th March
|
Managed to get signal from
triple resonance!
Re-ran biopack calibration
after rebooting console. Now get signal. Checked for attenuators
on 2nd and 3rd channels. Couldn't see any!
Seems they were not installed!! Varian sending attenuators! Note:
with higher powers: 15N compression factor was ~ 0.7, now it is
close to 1!
Runs keep crashing. With
dsp='r'; get the error message:
Rcvr1: Number of points
acquired is 61604 > than np!
Christine Hofstetter at Varian
informs me this may be a problem with the DTM board, which has
shown similar problems before!
|
18th March
|
Ran 15N -edited NOESY with
dsp='i'. Did not get the error message (Rcvr1: Number of points
acquired is 61604 > than np!), which suggests the DTM is not
the problem, maybe the ADC is not working properly.
However,
running dsp='i' does give some corrupted data. Varian have been
informed and are trying to work out what it is.
|
19th March
|
During
calibration (biopack) the low power 13C pulse profiles are very
erratic (jumpy). Indicating the modulators may be faulty. Have
informed Varian. They recommend running the auto tests with CH3I.
I will do this after running on Laurents sample.
|
22nd March
|
Running HNCA on
Laurent's sample, 80 scans
|
29th March
|
Attenuators
have arrived! As has the replacement probe and the weather
station! Will run tests on old probe first (autotest) and then
replace attenuator.
|
29th Marc
|
Did
the following with the attenuators:
channel
1: left as was (1dB)
channel
2: replaced 4dB with 6dB
channel
3: replaced 1dB with 6dB
channel
4: replaced 1dB with 6dB
using
autotest sample (shimmed ~ 7Hz) ran autotest for channel 1 and
channel2. And ZXY gradients (did not do heating and variable temp
tests).
|
30th March
|
New
pulse widths with attenuators are:
1H
(channel 1) 7 @ 59dB
13C
(channel 2) ~ 15 @ 59 dB
15N
(channel 3) ~ 40 @ 59dB (may use more power if you wish!)
|
2nd-4th
April
|
Ran
first 3D – get corrupted data. As seen before with
dsp='i'. Obviously, ADC or DTM not working properly. Varian have
sent ADC board (29th March), but cannot get engineer
here until week of 11th April.
|
5th April
|
The
3D experiment stopped saving data about halfway through the
experiment (but continued acquiring). The fid's were being
recorded (according to celem = 5549) but the number of fids that
we could ft were 3858. Eventually killed the experiment.
Started
drift test: noticed that during acquisition, the acq light did
not illuminate: traced this to the cable to spectrometer which
was loose (but it still recorded the fid).
|
6th April
|
Results of drift test
show loss of lineshape resolution after less than 12
hours, to eventual splitting (after 12).
Note comparing shim
values to march 9th shows:
Z1 changed by 897 DAC
units! This suggests Z1 is still unstable!!
|
7th April
|
Ran
another drift test which showed the same splitting within 12
hours!
Still
waiting to hear if VARIAN are sending an Engineer to install ADC
board. In addition I have informed Varian and Oxford about the
drift tests failing!
|
11th April
|
Still
getting corrupted data!
Ed Fadriallan will get
someone to run a drift test! Show little variation over 12 hours,
but after 17 hours the linewidth had doubled.
|
19th April
|
Claude
Major arrives from Varian. Installs a new manostat, DTM and ADC
boards. Also fixes cable for lock display.
Noticed
problem with lock – always seem to be locked “on” even
though, we ask it to be locked off. This was seen since the
beginning, but shifting Z0, and not getting a change in lock
response. I had mentioned this to Varian tec service – they
seemed to think it was OK: obviously was not!
|
22-25th
April
|
Ran a 13 hour
15N-edited hsqc- noesy. Saw no artefact's!
Ran a 48 hour drift
test with lock gain and level set to zero. Saw splitting, and
needed to change Z1 from 4306 to 4253 DAC units after run. i.e.
Had drifted by 71 units in 48 hours!!!
|
26th April
(Tuesday)
|
Mayen
(Varian engineer) arrives.
Runs an overnight
drift test
MSR
board was replaced for lock.
Engineer noticed an
extra release valve on the Helium boil off (before the manostat)
– could be the problem of the drift tests! No idea who should
have noticed it was there (Varian say Oxford, Oxford say Varian)
|
28th April
|
Lock
still playing up (Mayen “fixes” this)
|
29th April
|
Mayen
leaves, but I noticed lock is still not fixed. Phone Varian.
Apparently, Mayen noticed a loose ribbon cable. Varian are
sending a new one
|
2nd May
|
Apparently,
Mayen noticed a loose ribbon cable, which may be responsible for
the lock problem. Varian are sending a new one.
|
4th May
|
Try to install new
Biopack version (not just update). Cannot do this! When I inquire
with Varian, they say I have been hacked.
|
5th May
|
Back up all data
(vnmr1, vnmr).
|
6th May
|
Claude Major arrives
to install ribbon cable for
lock and reload system software.
Reload solaris version
9, from disks.
After
installing cable, Claude notices the lock is still playing up.
Ask for lock transceiver board to be sent.
Saw
the number point < np error. Claude reinstalled existing DTM
and ADC
We are disconnected
from the Internet for the time being.
|
6th -9th
May
|
Run a drift test on
doped D2O sample. For 60 hours. Results look promising. Will
repeat on 10th May with lineshape sample.
|
9th May
|
Installing new
Biopack. Installation OK.
Whole
new lock system is sent. Claude Major installs this.
Get
number point < nip error. Claude reinstalls the DTM and ADC
Everything
seems to be OK with lock and nip error.
Can
now run with dsp='r'
|
15th May
|
After a number of
drift tests we see splitting once more.
Oxford and Varian are
discussing what to do
|
18th May
|
Oxford decide to
either recycle all the shims or do a controlled quench
|
19th-24th
May
|
Tests with Biopack –
T1 and T2 data acquired, looks OK. Used hdwshim='y' option for
any Z1 drift during experiments
|
31st May-
2nd June
|
Ben Hubbard (Oxford)
arrives and does a 53 step shim cycle on 5 cryoshims. Ends up
putting in shim values originally mapped by Varian. i.e.:
Z1 -16.509 ZX 1.237
Z2 13.45 ZY -2.866
X 1.806 C2 -2.371
Y 0.493 S2 -3.704
|
6th-10th
June
|
Ming Quan from Varian
comes to map cryo and RT shims.
Cryo shims changed on
Tuesday 8th June:
Z1 -16.196 ZX 0.911
Z2 13.737 ZY -3.91
X 1.973 C2 -2.37
Y 0.28 S2 -4.128
|
10-15th
June
|
Drift tests show
splitting still
|
21st July
|
Oxford and Varian
agree to replace magnet. Possible delivery date is Mid August
|
23rd July
|
Noticed
Biopack given poor signal (as seen before 15-18 th March). Looks
like some flaky RF – I managed to get signal back by turning
off the system for a couple of hours. Not an ideal case. NEED TO
KNOW WHY THIS HAPPENS
|
9-11 August
|
John Day – Oxford
arrives to de-energise magnet
|
16th-18th
August
|
Mark Ashmore (Oxford)
arrives to pre-cool new magnet. Status: He filled, needs to be
energised (next week)
|
22nd-24th
August
|
Nick Wilson (Oxford)
energises magnet to -119.57 Amps (92.07 MHz 2H) and sets the
following superconducting shims:
Z1 -3.357 ZX 2.207
Z2 15.758 ZY 4.044
X 2.29 C2 -5.27
Y 7.057 S2 3.458
Z3 0
Note the extra supercon shim Z3 (doesn't seem to do much as it
has no current though)
|
30th Aug–
3rd Sept
|
Varian Engineer
(Kirabel) maps cryo and RT shimms
|
Sept-November 2005
|
Drift tests show
magnet still has a Z1 drift. Seems to be settling
|
November 8th
2005
|
Unable
to tune 2H on RT HCN probe. Sent back to Varian for repair.
Installed loaner HCN probe
|
December 7th
2005
|
Agreed
with Varian to write off system. Not enitirely happy as still
have the flaky problems (e.g. Flip back pulses and triple
resonance in Biopack, see 16th March, 23rd
July) , but only this way will we get the coldprobe installed
|
December 13th-14th
2005
|
Varian
engineer (Deane Alexander?) comes to check system. Agrees there
is some weird behavior with the shim system, after ejecting and
reinstalling the shims sometimes get worse and sometimes get
better, a very strange occurrence. He agrees something is wrong
but we decide to let this go!
I
Should have mentioned the Biopack problem. But unless it is
actually present at the time, it cannot be overcome.
|
January 10th-26th
2006
|
COLDPROBE installed by
Claude Major.
|
January 29th
2006
|
WFG
on 3rd Channel not working – I install a new one.
Biopack sequences not working again. Same problem as before (see
15th March). Calibrations for flipback does not work,
and triple resonance only works with TROSY (well gives some
signal)
Tried
to problem shoot with Varian but not able. In the end a reboot
resolved the problem. This problem is still unresolved.
|
Feb 8th
2006
|
Helium filled
|
Feb 5th-10th
February 2006
|
Seeing
error Rcvr No. of points acquired less than 2. Varian
promise to send a new DAC.
Also
find that get ADC overflow, when there is no obvious occurrence
in the spectra (using ddff(1)). Sometimes see the recvr overflow
light on the remote status come up (and no ADC overflow on the
SUN). Will see what happens after replacing DAC.
H2
90 deg pulsewidth seems very long (~ 150 microsec at 61 dB;
factory was 121.8 at 58 dB)
|
Feb 12th
2006
|
Numerous
problems. No pnts > 32668 continuously occurs.
Impossible to run anything. So I reseated the DAC. Saw all sorts
of stuff including Lost lock during acquisition, FIFO
underflow, unable to find Acode set, cannot find Acq stat .
MOST SCARY WAS I TURNED OFF COMPUTER AND CONSOLE FOR 20 MINUTES.
WHEN I RESTARTED THE SAMPLE WAS FROZEN..
Also running the cyroburn
produced a lot of garbage. Is the ion pump working?
|
Feb 14th-
15th
|
Tried
to run a cryoburn, experiment crashed due to rcvr points error .
Acq status was showing it was idle, but remote status indicated
it was still pulsing - also got a error on the pfg
console.. Resetting with setacq did not alter this or by
rebooting console. Every time I type su the same thing happens..
this is crazy!
Managed
to reset it with setacq – seems to be random.
Once
again sample frozen when console /spectrometer was turned off.
And rebooted. Eventhough VT-On is regulated. Seem to need to
reset VT, whenever reboot spectrometer.
PFG
problem tracked to a blown fuse – most likely happened due to
DAC board not operating properly).
|
Feb 17th
|
DAC
Board arrived (it was sent to the wrong address). I installed it.
Errors wrt overflows, revcr points etc have gone.
However,
15N is still not working properly, on both channels 2 and 3
(tested with benzamidine sample). Could be arcing (might happen
if ion pump is not taking the crap out).
|
Feb 18th-20th
|
Ran a cyroburn with
just ion pump. Looked very noisy. So I attached multi-task pump
and did cryo-burn over the weekend.
Error with cold probe
- “loss of cooling” power, for some reason lost water supply
to, all seemed OK when I arrived. Must be a dip in pressure or
flow
|
Feb 21st
2006
|
Claude
Major (varian Engineer) arrives, agrees with me that 15N is
arcing. Varian recommend to send the probe back for repairs.
|
Feb 22nd
2006
|
Replaced
Coldprobe with HCN RT probe.
Calibrations
with Biopack showed same problems as before (see 16th
March, 23 July, Jan 29th) i.e. No signal for most triple
resonance experiments, and flip back calibrations in BIOPACK do
not work. Tried reducing power levels by 3dB on 13C and 15N to no
avail...
This
problem keeps returning and can be removed by rebooting. But I
want to get to the cause of this. Maybe it is diagnostic of
common falut that has led to the changing of so many boards etc,
in the console...
|
Feb24th 2006
|
Got
another rcvr points error number of points acquired is 2 less
than np. Restarted experiment and got the same error (after about
2 days into the experiment)
|
March14th 2006
|
Varian
assure me coldprobe is OK – must be system
|
March 20th
|
Claude
Major arrives and tried to install new digital card cage – no
luck as the new one is faulty. The original is put back in.
Checked
15N power level with scope – all seemed OK. No luck with any of
this!
|
March 31st
|
Set to install cold
probe again. Failed due to loss in cooling power. This was due to
filters clogging for cooling water.
Still have not
received card cage!
|
April 1st
2006
|
Started cooling cycle
for cold probe. Ran a cryoburn over the weekend.
Need to condition on
1H, 15N and 13C first (page 20 coldprobe manual) then do a
cryoburn.
|
April 3rd -
5th
|
Did a cryoburn
Claude major installs
yet another card cage. Did not work, experiments would hang after
first fid!! Had to go back to UK, so left as is..
|
April 18th
|
Claude Arrives,
reinstalls old card cage. Notice thet power levels from PTS is
17dB (4.4V) should be around 11 dB( 2.2 V) . End up using ~ 1.8 V
for 3rd channel (a bit less than 10dB) .
This overcome the
problem with arcing on 15N with the cold probe. But DID NOT
OVERCOME PROBLEM WITH BIOPACK..
|
April 19th
|
15N pulsewidths were
too long after decreasing power from PTS, ended up changing the
attenuation after the 3rd channel amplifier, changed
this to 3 dB... (62dB gave a 15N 90 of ~ 33 microsec).
Biopack OK after
turning off. This problem is still not resolved
|
April 25th
2006
|
GOT THE ERROR np >
4.... STILL A PROBLEM WITH CARD CAGES/DIGITAL
|
May 1st
|
Still waiting for card
cages – Varian agree to replace current console with a
refurbished INOVA.
|
May 8th
2006
|
FIFO
Underflow error – crashed a 3D 15N-NOESY after 8 planes
|
May 9th
2006
|
Deane Alexander from
Varian arrives: new card cage installed. Seems to be working OK.
|
May 16th
2006
|
Platform officially
opened..
|
May 18th
2006
|
No problems with np
errors, etc.. Card cage seems to be working OK.
Filled Helium (was
56%) with 100 Litres
|
May 31st
2006
|
FLOOD in NMR room. ~ 9
pm phone call from security. Glycol leak lost ~ 450 L of glycol.
Damage to instrumentation as yet, unknown
|
June 2nd
2006
|
Damage to SUN
computer. Repaired over the weekend by microtext (Parc Avenue).
|
June 5th
2006
|
Claude Major comes to
check problems with system after the flood. Mini-task seems to
have lost it's turbo power. Can;t get a good vacuum on coldprobe.
Send away for a new one.
|
June 7th
2006
|
Lost cooling on Cold
probe. Hard to know why, but the water pressure was very low (20
psi) the absolute minimum value, This is the most likely problem.
|
June 8th
2006
|
Pressure and flow
still low, ask Jp Fortin and R. Chaisson to look into it and
hopefully make suggestions to improve the system.
Another unscheduled
warm up of coldprobe.. Pressure is low, must be the problem. Not
due to the filters as I replaced them yesterday (and back
pressure is good)
|
June 11th
2006
|
Another unscheduled
warm up of the coldprobe! Happened sometime between 18.30
Saturday (when i set up the experiment) and 9.30 Sunday morning.
Again not due to filters
|
June 12th
2006
|
Contacted HASKRIS
about a chiller. Forwarded response to JP Fortin. It would appear
that we the building guys cannot guarantee a stable supply of
glycol that is up to our specs (eventhough they had previously
said they could!). Thus our new plan of attack is to use a water
chiller
|
June 17th
2006
|
ANOTHER unscheduled
coldprobe warm up. Sometime between Friday evening and Saturday
morning. I checked glycol pressure etc and everything was in
spec..
|
June 19th
2006
|
Another unscheduled
cold probe warm up. Luckily I was around to restart cooling
before temp reached > 60 K. THIS HAPPENED THREE times this
morning.. loss of cooling power was due to low FLOW rate..
|
June 20th
2006
|
Lost cooling power
overnight causing another unscheduled cold probe warm up..
Since warm ups are
damaging to the probe, I will replace the coldprobe with the RT
HCN probe.
|
June 30th
2006
|
Had problems with
water suppression in T1 sequence ONLY for relaxT time between 0.3
and 0.7 seconds.. All other values of relaxT are OK..
Finally, I trouble
shot this problem to hardware. I noticed that I could not
calibrate water flip back pulses in Biopack (The old Biopack
problem). So I turned off the console for 1 hour. Upon rebooting
the problem had gone. It would appear the old Biopack problem has
not been removed by introduction of the new card cage!
Still no news on a
chiller.
|
July 12th
2006
|
Exchanged WFG between
first and 4th channels. Overcame problems with
Calibration of flipbacks in Biopack and manually
|
July 13th
|
Bugger!! Tried to run
T1 and again with relaxT=0.3 seconds I had receiver overflow! SO
looks like the changing of the WFG did not help!
|
July 14th
|
Tried using a hard
pulse for experiments – still no luck.
|
September 11th-22nd
2006
|
New
console arrives. Installation by Claude Major. Passes all APT
tests
|
September 25th
|
Biopack installed.
Everything OK
|
September 26th
|
NP greater than
errors... after running an overnight T1 experiment.
|
September 27th
|
Track NP error to DTM
board using digital diagnostic software.
Replace board with
board from old console. Seems OK (at least initially).
|
October 17th
2006
|
Fuses for amps on 3rd
and 4th channel blown after restarting the system.
Changed these, seem to be OK now
|
October10th - ??
|
Haskkris chiller has
arrived. However, despite knowing for three months, no pump for
the housing water supply has been installed.
27th
October new pump installed. BUT. Not enough power (despite having
been guaranteed this and the chiller being made to specifications
detailed by engineers here, who then cannot meet them -
priceless).
|
|
|
|
|
|
|
|
|